THE BARBADOS WATER Authority (BWA) wishes to inform the public that as part of the mains laying project in package ‘B’ there will be a road closure along Parris Hill, St Joseph near to Andrews Factory on Saturday, April 9 from 7:30 a.m. to 5 p.m.
Residents in Parris Hill will have access to the road running along the northern boundary of Andrews Factory.
Detour signs will be placed at Lammings, Easy Hall, Wilson Hill and Redland to direct traffic to rejoin Highway 3 at Sweet Vale.
Detour signs will also be placed at Blackmans, Airy Hill and Fisherpond directing motorists to rejoin Highway 3 at Fisherpond.
Motorists are encouraged to observe road signage and follow the direction of officials on site.
The BWA regrets any inconvenience caused. (PR)