• Today
    November 17

  • 06:45 AM

Guyana dedicates oil production ship

DPI,

Added 23 June 2019

liza-destiny-guyana

Guyana’s First Lady Sandra Granger (centre) aboard the Liza Destiny in Singapore. (DPI)

SINGAPORE – Guyana Saturday dedicated its first oil production vessel as the Caribbean Community (CARICOM) country moved closer to becoming an oil producing nation.

First Lady Sandra Granger, wife of President David Granger, officially dedicated the “Liza Destiny” at a ceremony held at the Keppel Shipyard here underscoring the importance of the project and industry to Guyana’s future socio-economic development.

“I think it is a fitting name (Liza Destiny) … because we are talking about destiny, we are talking about the long-term and we are talking about vision – not only the production but also the process and what comes behind it.

“It is my hope that this ship will bring to us the people of Guyana, not only physical prosperity, but greater cohesion, greater development and of course the sustainability of our country, and its people and culture,” she said at the ceremony attended by the Director of the Department of Energy, Dr Mark Bynoe.

In keeping with tradition and naming protocols, the dedication is performed by a woman who is termed the “godmother of the vessel” to bestow good luck and divine protection over the ship and all who sail aboard.

Guyana is hoping to begin commercial oil production next year and President of the US-based ExxonMobil’s Upstream, Liam Mallon, acknowledged the correlation between the name of the floating, production, storage and offloading (FPSO) vessel, the “Liza Destiny” and ExxonMobil’s intent to partner with the country over the long term.

“We are committed for a long voyage. We first signed an agreement to explore for hydrocarbons in the Stabroek block in 1999, we drilled the Liza well in May 2015, and this FPSO has been designed to produce oil for decades. It will provide value to Guyana and ExxonMobil for the long term. Our destinies, therefore, have been and will continue to be linked to Guyana in the future,” Mallon said.

He said that Liza Phase 1 is a global project with significant local participation as more than 1000 Guyanese are involved. This project involves completion of the FPSO and four subsea drill centres with 17 well.

The Liza Destiny FPSO was transformed from the oil tanker, “Tina”, a VLCC (Very Large Crude Carrier) built by Hyundai Heavy Industries in South Korea. The contract for its conversion was awarded to SBM Offshore in July 2017. The vessel is due to set sail for Georgetown next month and the officials said that the final work is being completed and several checks performed over the next few weeks. (CMC)

JOIN THE DISCUSSION

Dos and Donts


Welcome to our discussion forum here on nationnews.com. We encourage lively debate, but we also urge you to take note of the following:

  • Stay on topic – This helps keep the thread focused on the discussion at hand. If you would like to discuss another topic, look for a relevant article.
  • Be respectful – Meeting differences of opinion with civil discussion encourages multiple perspectives and a positive commenting environment.
  • Do not type in capitals – In addition to being considered “shouting” it is also difficult to read.
  • All comments will be moderated – Given the volume of comments each day, this may take some time. So please be patient.
  • We reserve the right to remove comments – Comments that we find to be abusive, spam, libellous, hateful, off-topic or harassing may be removed.
  • Reproduction of comments – Some of your comments may be reproduced on the website or in our daily newspapers. We will use the handle, not your email address.
  • Do not advertise – Please contact our Advertising Department.
  • Contact our Online Editor if you have questions or concerns.
  • Read our full Commenting Policy and Terms of Use.
comments powered by Disqus

POLL

Do you think the transaction fees at some banks are too high?

Yes
No

FRONT COVER OF TODAY'S NEWSPAPER

CARTOON

INSTAGRAM